back to Public Swimming Pools

Swimming Pool of Urbanization A-ver-o-mar in Albufeira

Attachments

Meet the range Public Swimming Pools

Meet the range Public Swimming Pools
Descriptive Memory

Intervention type: Construction of Public Swimming Pool

This project consists of a single tank that holds two pools, a children's pool and a pool for adults. Although the tank is the same the separation between these two distinct uses is made through a submerged short wall that allows children to be kept in this safety zone less deep.

There is also the alternative of moving from one side to the other dipping over that short wall therefore is not necessary to leave from one pool and then go into the other.
There is also a flowerpot which introduces a bit of a green in a space that is almost entirely paved. This contrast is important and promotes relaxation and relax.

Technical Title

Design and Technical Direction:
Monica Pedro (Arch.) - Anamig Swimming Pools - Ericeira's Carré Bleu
Swimming Pool shape: Polygonal Rectangular
Dimensions: 12,00 x 7,00 m + 5,6 x 3,6 m
Depth: 0,40 - 1,10 - 2,00 m.
Construction Technique:: Tradition
Staircase: Fully integrated
Inside lining: Reinforced PVC Membrane 150/100 white colour
Water Capacity: 138 m3
Recirculation cycle: 4 hours
Hydraulic drawing: Skimmers
Borders: Hydraulic anti-slip paving flags like roman travertine
Surrounding areas: Hydraulic anti-slip paving flags like roman travertine
Under-water Illumination: 10 Carré Bleu spotlights
Filtering equipment: Sand filter and Carré Bleu Electro-pump
Level Regulator: Carré Bleu
Water Treatment: 2 Carré Bleu Combined Salt 160 and Carré Bleu automatic PH

mainContent.decoTop mainContent.decoBottom